Aksum Client Signs Agreement for Solution to Convert Self-Insulating Block Production Line Mold from Square to Long-Box Design

08 May,2026

Guangzhou Hengde has entered into a cooperation agreement with a customer in Aksu on a project to retrofit square molds for the production of long-mold self-insulating blocks. The customer’s existing reciprocating saw on the old production line has numerous problems: the cuts are inconsistent, production capacity is low, large-scale manufacturing is unfeasible, and labor requirements are high. There is an urgent need to upgrade both the equipment and the manufacturing process.

MORE

Disc Saw Modification Project for the Homogeneous Self-Insulating Block Production Line of a Customer in Kashgar, Xinjiang

17 Apr,2026

A customer in Kashgar, Xinjiang, operating a factory for producing homogeneous self-insulating masonry blocks, was severely hampered by poor cutting accuracy and a high defect rate caused by its outdated circular-saw equipment, which significantly impacted production. After extensive evaluation, the customer ultimately selected Guangzhou Hengde’s eighth-generation self-insulating block cutting machine.

MORE

Vertical Reciprocating Saw Retrofit Project for Self-Insulating Block Equipment at the Wuwei Customer in Gansu Province

01 Apr,2026

A customer in Wuwei, Gansu, had previously relied on a vertical reciprocating saw‑cutting process supplied by a Henan‑based equipment manufacturer. This setup delivered low throughput, poor cut quality, high scrap rates, and significant material waste. After a period of operation, the machine could no longer produce any parts, forcing the factory to shut down. Having tried various solutions, the customer ultimately partnered with Guangzhou Hengde to implement an equipment‑and‑process upgrade, selecting Hengde’s eighth‑generation high‑precision rotary vertical‑saw system to replace and modernize their existing production line.

MORE

Modification of the cutting machine in the production line of expanded clay block equipment for a Zhejiang customer

10 Jul,2025

Zhejiang client's expanded clay aggregate block production line cutting machine upgrade: The original outdated cutting machine had become inoperable. After adopting Hengde's newly developed integrated horizontal-vertical cutting machine, cutting output has stabilized with superior product quality.

MORE

Xinjiang Tacheng customer self-insulation block equipment production line renovation

30 Jun,2025

The block equipment production line for a customer in Tacheng, Xinjiang, uses an old vertical cutting machine process, which is inaccurate and causes many broken saw blades. The production requires many workers, so the customer had to upgrade the equipment. Through the introduction of a local old customer, they chose the Guangzhou Hengde Automation Uniform Self-insulating Block Cutting Machine.

MORE

Xinjiang 6-meter mold autoclaved aerated block production line renovation self-insulation block project

12 May,2025

The Aksu customer's autoclaved aerated block renovation 6-meter mold production line is undergoing transformation. The customized Guangzhou Hengde equipment has arrived at the customer's factory, and the company has arranged professional technicians for coordination. The traditional aerated brick market is sluggish, while the market demand for integrated insulation structural products such as homogeneous self-insulating blocks and homogeneous insulation boards is increasing.

MORE