The pouring of the aerated brick production line and various parts of the mixer must be checked. Including whether the switching valve, electrical equipment, steam control circuit, gate valve, etc. are normal. In order to better release the water accumulated in the air compression bag, the cast castings should be neatly stacked, the stacking aspect ratio is appropriate, and pay attention to the passage of pedestrians. The aerated brick must check the pouring of the aerated brick production line and the various parts of the mixer. Including whether the changeover valve, electrical equipment, steam control circuit, gate valve, etc. are normal. In order to better release the water accumulated in the air compression bag, the cast castings should be neatly stacked, the stacking aspect ratio is appropriate, and pay attention to the passage of pedestrians.

加气砖生产线

must checkaerating brick production lineVarious components of the pouring and mixer. Including whether the switching valve, electrical equipment, steam control circuit, gate valve, etc. are normal. In order to better release the water accumulated in the air compression bag, the cast castings should be neatly stacked, the stacking aspect ratio is appropriate, and pay attention to the passage of pedestrians. The aerated brick must check the pouring of the aerated brick production line and the various parts of the mixer. Including whether the changeover valve, electrical equipment, steam control circuit, gate valve, etc. are normal. In order to better release the water accumulated in the air compression bag, the cast castings should be neatly stacked, the stacking aspect ratio is appropriate, and pay attention to the passage of pedestrians.


What should be paid attention to when applying the mixer of the aerated brick production line?


1. Before applying the concrete mixer, it is necessary to ensure that the concrete mixer complies with the regulations according to the inspection of the project construction management organization, review the license and inspection data, and then apply, the mechanical equipment must be stable and firm.
2. The temporary power supply should maintain the zero position, configure the electric braces holder, and carry out three-level power distribution and maintenance in two aspects. Generally, the switching valve rotates in one orientation for mixing. Therefore, when connecting the switching power supply, you must pay attention to the direction of the mixing drum to make it consistent with the direction of the arrow symbol on the mixing drum. Concrete solid brick.
3. Before starting, please check whether the insulation layer and grounding device of the electrical equipment are good, and whether the maintenance cover of the leather product guide is intact.
4. After the aviation parts are rotated, check whether the rotation direction of the mixing blade is appropriate, and then perform other water mixing in the water discharge.
5. When feeding the concrete mixer, do not step on it with your feet, and do not use scissors or a hammer to pull down or wipe the mouth of the vertical mixer. Items cannot collide with the mixing leaves, let alone stick in the warehouse when spinning. It is strictly forbidden to stand directly under the blender warehouse. When the silo starts and ends, it must be hooked off line.
6. During the operation, do not insert your hands and hammers into the vertical mixer, and do not put the gray paddle into the lips of the vertical mixer.
7. If there is a problem during the operation and the actual operation cannot be implemented, the switching power supply should be cut off and the cement mortar in the gas cylinder should be poured to eliminate the problem.
8. After the work is over, clean on site, maintain and clean the inside and outside of the mortar mixer of the aerated brick production line, block the switching power supply, and lock the door.







The above is the aerated brick production line manufacturers Xiaobian for everyone to sort out the relevant content, there is a need to contact us.