17

2020

-

09

Notice of Guangxi Housing and Construction Department and other five departments on the promotion and application of prefabricated stair slab prefabricated floor slab prefabricated internal and external wall panels in prefabricated building pilot cities (with interpretation)


Accelerate the promotion of mature technology of prefabricated buildings, actively play the leading role of demonstration in pilot cities of prefabricated buildings, and accelerate the development of prefabricated buildings in our region

Notice of Guangxi Taxation Bureau on Promoting the Application of Prefabricated Staircase Slab Prefabricated Floor Slab Prefabricated Internal and External Wall Slab in New Buildings in Pilot Cities of Prefabricated Buildings in Autonomous Region

Gui Jianfa 〔2020>> 〕8No.

 

Nanning, Liuzhou, Yulin, Hezhou Housing and Urban-Rural Development Bureau, Industry and Information Technology Bureau, Natural Resources Bureau, Transportation Bureau, Tax Bureau:
In order to further implement the "Guiding Opinions of the General Office of the State Council on Vigorously Developing Prefabricated Buildings" (issued by the State Council 〔2016>> 〕71No.), the "Autonomous Region Housing and Urban-Rural Development Department and other twelve departments on the issuance of the guidance on vigorously promoting prefabricated buildings to promote the modernization of the construction industry in our region" (Gui Jianguan 〔2016>> 〕64No.) and the "Notice of the Autonomous Region Department of Industry and Information Technology and the Autonomous Region Department of Housing and Urban-Rural Development on Printing and Distributing Several Measures to Support the Development of Guangxi's New Prefabricated Building Materials Industry" (Guangxi Gongxin Code 〔2020>> 〕2No.) and other documents, speed up the promotion of mature technology of prefabricated buildings, actively play the demonstration and leading role of prefabricated building pilot cities, and accelerate the development of prefabricated buildings in our region. The autonomous region's housing and urban construction department, industry and information department, natural resources department, transportation department and Guangxi tax bureau have decided to promote the application of prefabricated building components such as prefabricated staircases, prefabricated floors and prefabricated internal and external wall panels in new buildings in the autonomous region's prefabricated building pilot cities (hereinafter referred"Three Boards"). The relevant matters are hereby notified as follows:

 

1. "three board" application project implementation scope

(I)Nanning, Liuzhou, Yulin, Hezhou, etc.New affordable housing, commercial housing and dormitory (apartment) buildings are built in the central urban areas of the four autonomous regions and the centralized construction areas closely connected with them (the centralized construction areas are delineated by the pilot cities).

(II) Nanning, Liuzhou, Yulin, Hezhou and other four autonomous regions of prefabricated building pilot cities in the central urban area and the centralized construction area closely connected with it (the centralized construction area is designated by the pilot city) Single building area2More than 10,000 square meters of new hospitals, hotels, office buildings, and single building area5000More than square meters of new school buildings.

 

Implementation time of 2. "three boards" application project
Nanning, Liuzhou, Yulin, Hezhou and other four autonomous region assembly building pilot cities, New projects that have acquired land use rights from October 1, 2020 and are within the scope of implementation The use of prefabricated stair slabs, prefabricated floor slabs and prefabricated interior wall panels should be fully promoted, and the use of prefabricated exterior wall panels should be encouraged.

Requirements of the 3. for the units participating in the "three-board" application project

(I) construction units should actively adopt the general contracting model (EPC), coordinate the progress of project implementation and strictly implement"Three-board" application requirements. Encourage the adoption of the whole process engineering consulting model and actively apply BIMTechnology.

The (II) design unit shall design in accordance with the relevant standards and atlas of the state and Guangxi prefabricated buildings."three boards" to improve the degree of standardized application of "three boards,Indicate the "three-plate" application position and application area of each single building (if there is a requirement for the assembly rate, the assembly rate shall be indicated), and provide the corresponding calculation sheet.. Encourage the active use of BIMForward design to improve the design, production and application of parts and components.

(III) construction general contracting units should ensure the construction quality of the "three boards" and actively cultivate workers in the assembly construction industry. In the application of "three boards" projects, priority should be given to managers and operators who have experience in prefabricated building construction or have been trained in prefabricated building construction.

The production unit of (IV) parts and components shall produce parts and components in the factory, control the production and delivery quality of parts and components in accordance with relevant quality standards, and ensure the transportation quality and arrival time of the "three boards.

(V) the whole process engineering consulting unit should play a positive guiding role in the process of promoting the application of "three boards" in our district. The engineering supervision unit should strengthen the supervision responsibility and ensure the construction quality of "three boards.

4. "three board" application support policy

 

(I)NewIf prefabricated wall panels are used for the exterior wall of a building, the prefabricated part of the exterior wall may not be included in the construction area, but shall not exceed 3% of the above-ground construction area of the building.

The (II)'s sales of self-produced parts and components production units are in line with the Notice of the Ministry of Finance and the State Administration of Taxation on the Value-added Tax Policy for New Wall Materials (Finance and Taxation 〔2015>> 〕73issued by the number) of the specified conditions of the product,You can enjoy the VAT refund policy..

(III) Pair Application"Three boards" of commercial housing projects, such as the development of enterprises with good credit, in the development and construction funds have been invested.When the total investment of the project reaches more than 25% and the construction reaches the standard of ± 0.000, the commercial housing presale license can be applied.. In the presale licensing process, the presale filing price can be adjusted and floated according to the project cost factor.

5. relevant work requirements

(I)Mining above ± 0.000 elevation of new buildingUseProjected area ratio of prefabricated stair slab shall not be less than 80%The proportion of the projected area of the prefabricated floor slab shall not be less70%, the proportion of wall area using prefabricated non-load-bearing interior wall panels should not be less50%.Encourage the use of prefabricated exterior wall panels, and give priority to the use of prefabricated self-insulation exterior wall panels that can meet the energy-saving requirements of building exterior walls.

The competent departments of housing and urban-rural construction in pilot cities in the (II) should strengthen the supervision and management of the "third board" parts and components production enterprises, establish a directory database of the "third board" parts and components production enterprises and make it public to the public.

departments in charge of natural resources in (III) pilot cities should take into account local conditions,Incorporate the application requirements of the "three boards" into the conditions for land transfer.In the land transfer link to be implemented.

(IV) the new projects in each pilot city have special requirements and are not suitable for the application of the "third board", the competent department of housing and urban-rural construction of the city divided into districts and the relevant business departments shall organize expert argumentation, and the specific implementation rules shall be led by the competent department of housing and urban-rural construction of each city Formulate.
The competent department of (V) transportation shall speed up the application for highway overrun transportation license for trucks with ultra-high and ultra-wide components transported to each pilot city.
The competent departments of housing and urban-rural construction, industry and information technology, natural resources, transportation and taxation in the pilot cities of the (VI) should strengthen the supervision of the promotion and application of the "third board" system and take practical and effective measures to ensure the implementation of various supporting policies. The Housing and Urban-Rural Development Department of the Autonomous Region will timely cooperate with relevant departments to carry out supervision and guidance to ensure that the promotion and application of the "third board" system is implemented, and the implementation status will be reported to the People's Government of the Autonomous Region.
Guangxi Zhuang Autonomous RegionDepartment of Housing and Urban-Rural Development
Guangxi Zhuang Autonomous RegionOffice of Industry and Information Technology
Department of Natural Resources of Guangxi Zhuang Autonomous Region
Guangxi Zhuang Autonomous RegionDepartment of Transportation
State Administration of TaxationTaxation Bureau of Guangxi Zhuang Autonomous Region

 

20 August 2020

 

 

Annex
"On the new construction of assembly building pilot cities in the autonomous region.Policy Interpretation Materials for the Promotion and Application of Prefabricated Stair Slabs in Buildings
Background and Necessity of 1. Formulation

 

In September 2016, since the General Office of the State Council issued the "Guiding Opinions on Vigorously Developing Prefabricated Buildings" (Guo Ban Fa [2016] No. 71), our district has vigorously promoted prefabricated buildings, and twelve departments including the Housing and Urban-Rural Development Department of the Autonomous Region issued Policy documents such as the "Notice on Vigorously Promoting Prefabricated Buildings to Promote the Modernization of the Construction Industry in Our District" were issued to cultivate and guide the prefabricated construction market. By the end of June 2020, our district has compiled and issued 12 local standards and atlas related to prefabricated buildings, completed and put into operation 31 production bases for prefabricated building parts, with a production capacity of 5.82 million cubic meters of prefabricated concrete parts and 400000 tons of prefabricated steel structure parts. From a national perspective, the development of prefabricated buildings in our district is slow. In 2019, 74 new prefabricated building projects were built in the four pilot cities of the autonomous region, with a total construction area of 4.6811 million square meters, accounting for only 5.77 percent of the total new building area. It is far from reaching the 17% target set in the 13th five-year Plan of our district, and far behind the national average of 13.4 percent. Analysis of the reasons, mainly in the initial stage of assembly building, the production of parts and components is not standardized, large-scale, high cost, resulting in assembly building construction costs higher than traditional buildings. Therefore, in the absence of funds and policy support, the construction unit lacks the initiative to adopt the assembly construction method.

Prefabricated stair slabs, prefabricated floor slabs, and prefabricated interior and exterior wall panels (hereinafter referred to as "three boards") have the lowest cost increment in assembly building components and the most mature technology. The promotion and application of the "three boards" can form a scale effect without greatly increasing the construction cost, effectively reduce the production cost of the "three boards", thereby reducing the construction cost of prefabricated buildings, forming the independent development power of the prefabricated construction market, and accelerating the development of prefabricated buildings. development. Therefore, it is necessary to issue the notice on promoting the application of prefabricated stair slab prefabricated interior and exterior wall panels in new buildings in the pilot cities of prefabricated buildings in the autonomous region (hereinafter referred to as the notice).

Document basis for 2. policy formulation
(I) the Guiding Opinions of the General Office of the State Council on Vigorously Developing Prefabricated Buildings (Guo Ban Fa [2016] No. 71);
(II) "13th Five-Year Plan of Action for Prefabricated Buildings" (No. 77 [2017]);
(III) the "Autonomous Region Housing and Urban-Rural Development Department and other twelve departments on the issuance of vigorously promote prefabricated buildings to promote the modernization of the construction industry in our region's guidance notice" (Gui Jian Guan [2016] No. 64);
(IV) the "Autonomous Region Housing and Urban-Rural Development Department on the issuance of Guangxi Zhuang Autonomous Region prefabricated building development" 13th Five-Year "special planning notice" (Gui Jian Guan [2017] 102).

Interpretation of the main contents of the 3.

What is the scope of application and implementation of (I) "three boards?

1. The implementation scope of the "three boards" is divided into the central urban areas of the four autonomous regions, including Nanning, Liuzhou, Yulin and Hezhou, and the centralized construction areas closely connected with them (the centralized construction areas are designated by the pilot cities). Affordable housing, commercial housing, dormitory (apartment) buildings and new hospitals, hotels, office buildings with a single building area of more than 20000 square meters, and new school buildings of more than 5000 square meters, mainly based on four considerations: First, since our district listed Nanning, Liuzhou, Yulin, and Hezhou as pilot cities for prefabricated construction in 2016, the prefabricated construction technology of the four cities has been greatly developed, especially The production and installation technology of the "three boards" has matured and has the basis for vigorous promotion. Second, the prefabricated construction industry bases in our district are concentrated in Nanning, Liuzhou, Yulin, and Hezhou. After investigation, the production capacity of the existing industrial bases in the four cities is sufficient to support the needs of promotion. Third, the construction land in the central urban areas of the four cities and the centralized construction areas closely connected with them is relatively concentrated, and the scale of construction projects is large, which is suitable for the application of "three boards". Fourth, most of the floor structures of the above-mentioned types of buildings are highly similar, and the "three boards" are easy to standardize production and installation, which is conducive to reducing construction costs and shortening construction periods.

2. The single building area refers to the total building area of the above-ground part of the single building.

3. Nanning, Liuzhou, Yulin, Hezhou and other four cities to apply the "three boards" should at least include the central urban area of the city, and the closely connected centralized construction area should be delineated by the four cities according to their own development planning and actual needs.

How to define the time for the promotion and application of (II) "three boards?

Whether new projects within the scope of the implementation of the Notice apply the "three boards", divided by the time of acquisition of land use rights, and new projects that acquire land use rights after October 1, 2020 should apply the "three boards" as required by the Notice ".

What are the usage requirements for prefabricated stair slabs, prefabricated floor slabs, and prefabricated internal and external wall panels in (III) "three-board" application projects?

1. Prefabricated stair slab, prefabricated floor slab and prefabricated internal and external wall slab refer to the stair slab, floor slab and wall slab produced and constructed by assembly construction. Its raw materials are not limited to concrete, but also include steel, wood, etc.

2. For projects within the scope of implementation of the Notice, the usage of "three boards" shall meet the requirements stipulated in Item 1 of Article 5 of the Notice that "the proportion of projected area above 0.000 elevation of new buildings using prefabricated stair slabs shall not be less than 80%, the proportion of projected area using prefabricated floor slabs shall not be less than 70%, and the proportion of wall area using prefabricated non-load-bearing interior wall slabs shall not be less than 50%.

3. The calculation range of prefabricated stair slab, prefabricated floor slab and prefabricated internal and external wall slab is above the building ± 0.000 elevation, and prefabricated non-load-bearing internal wall slab does not include shear wall; Roof is not included in the calculation range of floor slab.

What are the supporting policies for the application of "three boards" in (IV)?

Projects that apply the "three boards" can enjoy support policies such as external wall area rewards, value-added tax collection and refund, presale permits in advance, and presale record price adjustments.

What are the responsibilities and requirements of the units participating in the construction of the (V) and the relevant government departments in the application of the "three boards?

The "Notice" puts forward clear requirements for the responsibilities of the participating units and relevant government departments in the "Third Board" application project to improve the design, production, transportation and construction quality of the "Third Board" and promote the smooth implementation of the project.

Prefabricated building