Air-added Brick Production Process Hengde New Environmental Protection CLC Technology


The production process of aerated block production equipment is generally as follows: various raw material storage store→ metering and batching → raw material water mixing and stirring → mold preparation → pouring → foaming static stop → demoulding → cutting → curing → inspection of finished products → packaging → palletizing storage → delivery.

  Production process of aerated block production equipmentGenerally, it is: all kinds of raw material storage bin → metering and batching → raw material mixing with water → mold preparation → pouring → foaming static stop → demoulding → cutting → curing → inspection of finished products → packaging → palletizing storage → delivery.
 
1. Preparation of raw materials
 
The production of aerating bricks first grind siliceous materials such as sand and fly ash, among which, according to the requirements of raw materials and process characteristics, some adopt dry grinding into powder, some add water wet grinding to make pulp, and some add tailings slag and other mixed grinding.
 
4. Feeding ingredients
 
Feeding is the on-site metering equipment for measuring various raw materials prepared and stored for use, adjusting temperature and concentration and adding a small amount of materials, and then feeding the mixing equipment in turn according to the process requirements.
 
5. Pouring
 
The pouring process is to mix the materials put into the mixer after the previous batching process is measured and adjusted as necessary to make slurry that meets the time, temperature and consistency requirements of the process, and pour into the mold through the pouring port of the mixer.
 
6. Static stop
 
The static stop process is mainly to promote the slurry after pouring to continue to complete the thickening, hardening, foaming expansion, embryo body maintenance and other processes.
 
7. Cutting
 
The cutting process is to divide the embryo body of the aerated brick and process the shape to make it meet the requirements of the shape and size. Guangzhou Hengde is equipped with a special high-precision high-speed cutting saw for aerated bricks, with fast speed, accurate cutting and maintenance.
 
8. Maintenance
 
The curing process is to steam curing the aerating brick embryo body. Guangzhou Hengde adopts air energy curing equipment, which is environmentally friendly and low energy consumption.
 
9. Product stacking
 
The latter process of aerated brick production, including product breaking, inspection, packaging and stacking, waiting to be sold on the market.
加气砖生产工艺流程
 
   Process flow of aerated brick productionThe general process is as described above, while Guangzhou Hengde's new aerated brick equipment adopts CLC technology and equipment imported from Germany to realize the production and development mode of energy-saving, waste-saving and environmental protection wall materials. A set of production lines can produce aerated bricks, foam bricks, blocks, high-precision waterproof blocks, light wallboards and other products.